Wednesday, 11 March 2020 00:00

Skelly & Couch on Twickenham Riverside team

Leading building environment and services engineers Skelly & Couch are part of the preferred multidisciplinary team led by Hopkins Architects which has beaten four other contenders to develop Twickenham Riverside. 

Thursday, 29 August 2019 10:47

Marlborough College Science Centre

Refurbishment and update of Grade II-listed Science Buidling for historic boarding school.

Thursday, 09 May 2019 14:05

Polka Theatre

The original 40-year-old Polka Theatre in Wimbledon was the first UK theatre venue dedicated exclusively to children. This project features a refurbishment of the theatre with an added extension to the rear of the building led by Foster Wilson Size Architects.

Thursday, 09 May 2019 13:27

Mountbatten House

Heritage-led refurbishment and replacement of services in this iconic Grade II-listed office block.

Wednesday, 08 May 2019 12:51

Tring Park School for the Performing Arts

This project provides a new boarding house and hub building for Tring Park School for the Performing Arts, in Hertfordshire. The construction of a new boarding house will increase on-site accommodation, and the new hub building will provide a new reception, administration area, teaching and sixth form facilities for the school.

Wednesday, 08 May 2019 11:26

Windsor Walk

This project was the extensive refurbishment and reinstatement of six derelict Victorian terraced town houses in Denmark Hill, London. Four of the houses (numbers 6-9) were combined and converted into a 24-bedroom temporary accommodation unit, while the other two houses were redeveloped and sold as luxury 4-bedroom houses (numbers 10 and 11).

Wednesday, 08 May 2019 10:41

Jacksons Lane Arts Centre

Founded in 1975 inside a former Wesleyan Methodist church, Grade II-listed Jacksons Lane Arts Centre has played a key role in the development of London’s fringe and community theatre. The latest project upgrades technical and visitor facilities within the complex, which features a 166-capacity theatre, large-scale studio and café-bar, all of which were in need of repair.

Wednesday, 08 May 2019 09:52

New College Court, Emmanuel College

A phased transformation of the Emmanuel College Site around three new landscaped courts.

 

New residential student blocks with 59 ensuite rooms, gyms, fellow flats, and a 50-space subterranean car park, plus the transformation of a Grade II listed building to provide seminar, teaching, office, bar and event spaces along with the rebuilding of the South Court Social Hub.

 

The project was Emmanuel College’s most significant development for over 100 years and was located in the heart of the Cambridge Historic Core Conservation Area, in close proximity to the College’s historic Grade I and Grade II listed buildings.  The aim was to redevelop a neglected part of the College site to create new facilities that enabled the College to meet its ambition to accommodate all undergraduate students on-site and for its community to mix, work and gather in new ways.  Skelly & Couch were appointed as both M&E engineers and sustainability consultants and undertook full design duties using BIM. 

From inception, Skelly & Couch worked closely with the architects to ensure the building massing and orientation was optimised to make best use of daylight and sunlight in all internal and external spaces.  The advantages and disadvantages of concrete and CLT frames were considered and GGBS concrete frame with timber internal partitions and highly insulated timber facades was chosen for its improved performance in terms of summertime overheating and acoustics. 

The system design included a number of energy and water saving measures such as mechanical ventilation and heat reclaim, rainwater recycling, Combined heat and power hot water heating, efficient LED lighting and controls.  The strategy also included the implementation of an open loop ground source heat pump system that takes water from the underlying Lower Greensand Formation and provides heating and cooling to all of the buildings in the South of the College.  It also includes an extensive 60kWp PV array on the South Court Building. 

All of these measures represented an 80% operational carbon controls, low flow water fittings and a large Photovoltaic Array on the roof that powers the communal spaces.

Driven by a vision to cultivate an interconnected community, Emmanuel College adds a contemporary layer to its historic setting while enhancing social and intellectual life and prioritising sustainability for future relevance.

 

Press Coverage

Architecture Today

 

Wednesday, 08 May 2019 09:07

National Theatre Costume Workshop

The existing 5th floor costume workshop department at the Grade II*-listed National Theatre is undergoing a full refurbishment to meet up-to-date compliance requirements and better meet the needs of the costume workshop users.

Tuesday, 07 May 2019 15:42

Warburg Institute

Skelly & Couch is presently involved in the refurbishment and building extension of the Warburg Institute which addresses the building’s infrastructure issues but also instigates the development of a new lecture theatre in a 1950s library.

Page 1 of 3